×

You are using an outdated browser Internet Explorer. It does not support some functions of the site.

Recommend that you install one of the following browsers: Firefox, Opera or Chrome.

Contacts:

+7 961 270-60-01
ivdon3@bk.ru

Estimation of the duration of laying concrete mix on the installation horizon

Abstract

Estimation of the duration of laying concrete mix on the installation horizon

Mikhaylova E.V., Orekhova D.V.

Incoming article date: 13.02.2023

The article discusses the peculiarity of determining the duration of laying concrete mix depending on the height of the installation horizon. As a result of the study, the design was justified, which was accepted as a representative object, a sample of standard values of machine time costs was performed depending on the height (number of floors) of the building, the dependence of the calculated value of machine time costs on the height of the floor (the horizon of the work) was obtained, the reliability of the calculated values was estimated.

Keywords: monolithic construction, concrete works, labor intensity of work, duration of work, installation horizon, tower crane