×

You are using an outdated browser Internet Explorer. It does not support some functions of the site.

Recommend that you install one of the following browsers: Firefox, Opera or Chrome.

Contacts:

+7 961 270-60-01
ivdon3@bk.ru

  • Preservation of greenery during construction

    The issues of preserving existing green spaces and other elements of the natural landscape during new construction are considered. Methods for preserving perennial plantings throughout the entire course of construction are proposed. If it is impossible to save the tree at the construction site, a method of transplanting it to another place is proposed. It is proposed at the stage of design and survey work to identify healthy trees that do not grow on the site allocated for a building (structure) under construction. Then solve the problem of locating the object on the ground in such a way as to preserve healthy perennial trees as much as possible. To do this, it is necessary to carry out the removal of the object to the area, moving it as far as possible from healthy trees. The distance required to protect the tree from external influences during work is equal to the projection of the crown on the ground plus 1.5 m. At this distance, it is recommended to make stationary fences for each tree. A tree transplantation scheme and a method for calculating its weight for the selection of equipment for digging and transportation have been developed.

    Keywords: landscaping, construction, tree, tree transplanting, asphalting